Green Code
Buffalo Green Code (our zone is N2-R)
Buffalo Zoning Board of Appeals
City Meetings and Agendas
Packet from the Zoning Board of Appeals meeting 3/10/2025 (attached)
Variances on the agenda: green code analysis
3.2.11.D.a: front setback
3.2.11.D.c: corner side setback
3.2.11.E: density
3.2.11.E.a: height
3.2.11.F.d: blank wall
7.2.2.B.4: fence height
8.A: bicycle parking
perhaps 8.2.1.B: 90% of required bike spots (4 or 5?) secure, sheltered, and enclosed
vs 6 unsecure, unsheltered, non-enclosed
8.3.3.A.1: parking lot location
9.4.1.A.2: sign size
Buffalo Green Code: https://bufgreencode.com/
Criteria for (Area?) Variance
11.3.5.E.2.i: fits the character of the area
11.3.5.E.2.ii: no more reasonable alternatives
11.3.5.E.2.iii: not too substantial of a variance
11.3.5.E.2.iv: no adverse consequences
11.3.5.E.2.v: not a self-created problem
Other green code violations in the plans
3.2.11.D.d: interior side setback
3.2.1.F: additional 1 foot per height in excess of bordering zone
about 1.5' too close to 301 Lafayette SE corner of lot
7.1.4.A.1: new street trees
6 required on hoyt, none in plans
7.1.5.A: parking landscape required
none in plans
7.1.5.B.2: parking landscape on interior border
7.1.6: 5' 5' buffer: shrubs and wall on interior border
only 1.5' buffer next to Lafayette SW corner of lot
barely 1' buffer next to to 299 Lafayette garage
7.1.5.C.1: 10% of parking lot interior landscaped
none in plans
7.1.5.C.2: 1 shade tree
none in plans
7.1.5.C.3: terminal islands, 8', w/tree
none in plans
Major site plan review
11.3.7.C.1: major review required prior to building permit being issued
11.3.7.D.14: landscape plan required
7.1.1.B: no relevant exception
11.3.7.D.15: Storm Water Pollution Protection Plan (SWPPP) required
a. 7.1.5.C.5: integrated with parking interior landscaping
b. 7.3.1.A: no relevant exception
c. 7.3.3.A: erosion and sediment control also required
d. 7.3.3.C: follow the NYS Storm Water Management Design Manual
e. 7.3.3.D: peak flow in a 25 year storm must be less than pre-construction peak flow in a 2 year storm
11.3.7.D.16 lighting plan required
7.4.1.B: no relevant exception
Material from the Preservation Board 9/22/2022 - 303 Lafayette Avenue - Demolish a religious building