Replying to: Updated Plan from the developers > Parent comment

The Stormwater Prevention Plan has major inconsistencies:

  1. On the Short Environmental Assessment form, the answer to 18. Does the proposed action include construction or other activities that would result in the impoundment of water or other liquids? was No, but the stormwater plan describes "catch basins" and "a bioretention basin."

  2. Several included documents refer to 303 Lafayette as "Vacant Land", with the only included structure sited at 144 Hoyt. I have seen in a rainstorm how no rainwater runs off it. Yet the "Summary of Areas" in the stormwater plan lists 8,000 sf Existing Building Areas and 14,122 sf Impervious Areas!

⬇ Screenshot_20250713_144931.png
,
⬇ Screenshot_20250713_145006.png
,
⬇ Screenshot_20250713_150616.png
,
⬇ Screenshot_20250713_145037.png