3.2.1.F: additional 1 foot per height in excess of bordering zone
about 1.5' too close to 301 Lafayette SE corner of lot
7.1.4.A.1: new street trees
6 required on hoyt, none in plans
7.1.5.A: parking landscape required
none in plans
7.1.5.B.2: parking landscape on interior border
7.1.6: 5' 5' buffer: shrubs and wall on interior border
only 1.5' buffer next to Lafayette SW corner of lot
barely 1' buffer next to to 299 Lafayette garage
7.1.5.C.1: 10% of parking lot interior landscaped
none in plans
7.1.5.C.2: 1 shade tree
none in plans
7.1.5.C.3: terminal islands, 8', w/tree
none in plans
Major site plan review
11.3.7.C.1: major review required prior to building permit being issued
11.3.7.D.14: landscape plan required
7.1.1.B: no relevant exception
11.3.7.D.15: Storm Water Pollution Protection Plan (SWPPP) required
a. 7.1.5.C.5: integrated with parking interior landscaping
b. 7.3.1.A: no relevant exception
c. 7.3.3.A: erosion and sediment control also required
d. 7.3.3.C: follow the NYS Storm Water Management Design Manual
e. 7.3.3.D: peak flow in a 25 year storm must be less than pre-construction peak flow in a 2 year storm
Packet from the Zoning Board of Appeals meeting 3/10/2025 (attached)
Variances on the agenda: green code analysis
Buffalo Green Code: https://bufgreencode.com/
Criteria for (Area?) Variance
Other green code violations in the plans
Major site plan review
11.3.7.C.1: major review required prior to building permit being issued
11.3.7.D.14: landscape plan required
11.3.7.D.15: Storm Water Pollution Protection Plan (SWPPP) required a. 7.1.5.C.5: integrated with parking interior landscaping b. 7.3.1.A: no relevant exception c. 7.3.3.A: erosion and sediment control also required d. 7.3.3.C: follow the NYS Storm Water Management Design Manual e. 7.3.3.D: peak flow in a 25 year storm must be less than pre-construction peak flow in a 2 year storm
11.3.7.D.16 lighting plan required